Not always what it seems.

We take the time to research and look into projects much more than our competitors. This swimming pool deck renovation and master landscape could have started off on the wrong foot if our team didn’t know that the existing concrete was nearly 9 inches thick. Normally a concrete pool deck or patio is 4-5 inches maximum with compacted base gravel. I can only imagine that concrete was much more inexpensive when this pool deck was poured and intend of gravel they decided to pour it as thick as a freeway! Either way it was a challenge but doing our homework certainly helped out in this scenario. The more projects and issues such as this we run into always make us stronger, smarter and more creative which always results in a better product and service for our clients. Greensource, striving to be the best landscape & development firm in our market.

Wednesday, November 7th, 2012